๐Ÿ“Š
Introductory-to-intermediate cost-control survey

Project Cost Control & EVM

Build a cost baseline, track it with earned value, and forecast the finish -- the project cost controller's toolkit, made interactive.

An intuitive, interactive course on project cost control and Earned Value Management (EVM) for commercial project managers, project controllers, PMO analysts, and cost engineers. Build a time-phased cost baseline from a work breakdown structure, track it with planned value, earned value, and actual cost, compute the EVM indicators (cost and schedule variance, CPI and SPI), forecast the estimate at completion, read the S-curve and CPI trends, and run variance analysis and change control. Every lesson pairs plain-language explanations with precise curves, worked examples, a live self-checking simulator, and practice you can verify yourself. All figures are illustrative synthetic teaching examples.

7
Modules
23
Lessons
7
Free previews
Unlock every paid lesson in this course with a single purchase.
Unlock the full course โ†’
๐Ÿ“

Cost Baselines & Budgets

Where cost control starts: the work breakdown structure and control accounts, the time-phased budget, and the cost baseline (the PMB) you measure everything against.

๐Ÿ“ˆ

Tracking Cost: PV, EV, AC

The three numbers that drive earned value: planned value, earned value, and actual cost -- what each measures and how to read percent complete honestly.

โš–๏ธ

Earned Value Math

The EVM indicators: cost variance and schedule variance, then the CPI and SPI efficiency ratios that tell you whether the project is over budget or behind schedule -- home of the live EVM dashboard.

๐Ÿ”ฎ

Forecasting: EAC, ETC, VAC

Turn today's performance into a forecast of the finish: the estimate at completion, the estimate to complete, the variance at completion, and the to-complete performance index.

๐Ÿ”

Variance Analysis & Change Control

Turn a variance into an action: root-cause a cost or schedule variance, protect the baseline through change control, and tell management reserve from contingency.

๐Ÿ’ผ

Cost Control in Practice

Put it together on a synthetic recovery case study, learn the common cost-control pitfalls, and report cost performance clearly to stakeholders.

New lessons are added continuously. Every lesson pairs plain-language explanations with a live, self-checking cost-control widget.